SMRT Thomson-East Coast Line
The Thomson-East Coast Line (TEL) is a joint line between the Thomson Line and the Eastern Region Line. The 43km TEL will add 31 new stations to the existing rail network, with 7 interchange stations, which will link to the East-West Line, North-South Line, North-East Line, Circle Line and the Downtown Line. It is expected to begin full operation in 2019.
Scope of Work
Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
4,861 km of PVC/ XLPE Cables
4,861 km of PVC/ XLPE Cables
1,100 km of Fire Resistant Cables
1,100 km of Fire Resistant Cables
105 km of Flame Retardant Cables
105 km of Flame Retardant Cables